This page pulls together three pages on this site about the city library into one page.

Newcastle City Library (also known as the Charles Avison Building) is a library in the city centre of Newcastle upon Tyne, United Kingdom. Completed on 3 March 2009, the building opened on 7 June 2009, and is the city's main public library. The main feature of the building is a long 'glass box' forming the eastern side of the steel frame structure.


Replacing the old building

The city's central library has been on this site since Victorian times, with the original building demolished in the 1960s to make way for a concrete and steel structure designed by Sir Basil Spence situated on the corner of John Dobson Street and New Bridge Street West, which opened in 1968. The neighbouring Laing Art Gallery had originally been built as an extension of the old Victorian library and was left somewhat out of context following the demolition of the older building, with a blank brick wall facing towards the city centre.

The 1960s building rapidly became unfit for the purpose of a modern public library with its name changing in the late 1990s from Central Library to City Library. Additionally, the 1960s design of the library became regarded as exceedingly ugly, with local TV presenter and author John Grundy describing it as "a monstrous concrete blob". The road to the rear of the library, John Dobson Street, used to have a concrete canopy which hung over the dual carriageway stretching from Durant Road up to the junction of New Bridge Street West. This canopy was at the official ground floor level of the library and provided the library with an entrance to the rear with access onto which was ultimately a rather unused large pedestrian area with seats and other street furniture. In the late 1990s the canopy was demolished back to the Bewick Court high rise block of flats which resulted in the rear-facing entrance becoming redundant, as it had nothing to connect to and became a balcony.

The library was closed on 1 September 2006, and demolished from April to July 2007. The foundation stone marking the construction of the new library was ceremonially laid by the Mayor on 17 December 2007. The Poet Laureate Andrew Motion was guest of honour at the handover of the new building from the contractors to the City Council on 3 March 2009. The new building is situated directly on top of the old building, which resulted in the closure of the 'Dobsons' Bar which utilised the lower ground floor area (which opened onto New Bridge Street West directly).


The new building

It is named the Charles Avison Building after the 18th-century Newcastle composer. It was dedicated on 21 June 2009.

The opening day, 7 June 2009, featured a programme of entertainment from musicians performing in the entrance hall and fictional characters including Captain Hook, Sherlock Holmes, Alice in Wonderland, The Queen of Hearts, The Gruffalo and Peter Rabbit. The six-storey building contains a marble-floored atrium, a viewing platform, a 185-seat performance space, a cafĂ© and an exhibition space. Construction cost was £24 million.

It was officially opened by Her Majesty The Queen and His Royal Highness The Duke of Edinburgh on 6 November 2009.

The new building features many technologies specifically designed for use in libraries. Every book is fitted with a digital tag, meaning books can be checked out and returned via automated checkout points, and theft of stock becomes much harder. Staff members carry hands-free voice-activated WiFi radios to communicate with other members of staff, a first in the UK.

Description courtesy of Wikipedia.






23rd February 2023








1st November 2021








19th September 2017








2nd November 2014








25th December 2013








16th May 2009





























19th April 2009











10th March 2009










2nd March 2009









22nd February 2009









30th January 2009








16th January 2009









29th September 2008








15th August 2008








3rd July 2008








29th June 2008








22nd June 2008








10th June 2008









4th June 2008









3rd June 2008








11th April 2008



Central Library Construction




26th March 2008








24th February 2008








16th February 2008








24th January 2008








14th January 2008








6th January 2008








13th December 2007








23rd November 2007








16th November 2007








6th November 2007








29th October 2007








4th October 2007








7th September 2007








8th August 2007








6th July 2007








4th June 2007









4th June 2007








31st May 2007











25th May 2007









21st May 2007








16th May 2007








10th May 2007








8th May 2007








3rd May 2007








24th April 2007








19th April 2007








17th April 2007








13th April 2007








10th April 2007








5th April 2007








13th March 2007








3rd April 2006









29th March 2006











A time lapse film of the demolition of Newcastle City Library in preparation for the building of a new City Library.






A short video from City Library on Youtube showing the first phase of the demolition.






A photographic slideshow of the demolition from beginning to end.






More information: